GVE GS TIDE ECOSYSTEM
Integrated circular economy · 80 MGD desalination · Vertical data center · EV/hybrid logistics · Gold Grade Carbon
⚡ Awais Soomro · EV Logistics Director
15+ years hybrid vehicles · CSS master · e‑commerce expert · GVE ecosystem partner
Awais Soomro
EV & Mining Logistics VPS Director
Years hybrid
vehicles sold
CSS mastery
e‑commerce
Hybrid portfolio
- • Toyota Prius (26 km/L) — PKR 3.5M
- • Honda Insight — PKR 4.0M
- • Nissan Leaf EV — range 240 km
- • Toyota Aqua — PKR 2.8M
CSS mastery
50+ online stores built
🌍 GVE ECOSYSTEM · DIRECTORS & PARTNERS
Syed Shabbir Ahmed
CTO · Technical Lead
📞 0313-1201125 / 0333-3898221
✉️ (via GVE)
🔗 zamirengneering.gvegstide.com
🏭 KCIP · 80 MGD Desalination + Vertical Green DC
Korangi Creek Industrial Park (SEZ) · 10‑story data center · Israeli Sorek model · INCOLING 200 MW embedded power
📋 KCIP High‑Density Zone vs proposed
| Parameter | KCIP HDZ Rules | Proposed Data Center |
|---|---|---|
| Min lot / used | 0.5 Acre | 9 Acres |
| Height limit | G+19 | G+10 |
| Footprint ratio | ≤50% | ~45% |
| Use | IT/Commercial | Green Data Center |
80 MGD SWRO (Sorek‑inspired)
- 16‑inch vertical membranes → footprint 0.16 m²/m³/d
- Process area: 15 acres SWRO + 15 pre‑treatment + 20 ZLD
- Energy recovery → 3.5‑4 kWh/m³
- Brine → membrane distillation (waste heat)
INCOLING 200 MW + rooftop hybrid
- 200 MW dedicated power plant (captive + grid support)
- Rooftop solar 2 MW + VAWT 0.5‑1 MW → 4.7 GWh/yr
- Net billing shift (2026): self‑consume @ Rs 60 saved vs Rs 10 export
Waste heat → MD
Liquid cooling captures 40‑60°C → membrane distillation, boosts overall efficiency 17%.
PUE < 1.2 SEPA compliant
⚡ Industrial tariff Feb 2026 (B3 / 11‑33 kV)
| Fixed | PKR 1,250/kW/m |
|---|---|
| Peak | 35.68/kWh |
| Off‑peak | 23.67/kWh |
Incremental @ PKR 22.98/kWh
💰 Investment estimates (USD million)
SWRO plant
Data center
INCOLING power
10‑12 year payback · 80 MGD water to Korangi / Landhi
📚 GPCCPEDIA · GLOBAL REGISTRY & PLATFORMS
ecosystem central contacts
Complete Green Infrastructure · 3‑Year Post‑Payback Plan · Korangi Creek Development Projects, Karachi